Tuesday, June 14, 2011
Saturday, June 11, 2011
May 2011 Coliform Submission/Report Form
Apologies for it showing up a day late. We had to resubmit the sample because the sample temperature was too high. In any case, we passed.
Wednesday, June 8, 2011
Fence Going Up
36 Hour Test
This morning began the 36 hour test which will entail sending 3 bacterial samples and a comprehensive panel (metals, etc..). In addition, personnel will be on site to monitor well water depth readings every hour.
A squirrel is grabbing a quick sip of water from the well water runoff. She seemed to approve.
A squirrel is grabbing a quick sip of water from the well water runoff. She seemed to approve.
Friday, June 3, 2011
Flushing
The new well is now being flushed. The water will be tested several times and once that is cleared well #2 can be hooked into our current system.
Wednesday, June 1, 2011
Base Meter
Sight Glass
The sight glass for the pressure tank has been updated. The tube was procured online easily, but the original connections for it proved much more difficult. It has now been reworked with fittings easily found at Home Depot.
Here is the final setup for the chlorination system. The storage unit came from Home Depot. It fits 2 chlorine barrels perfectly and was the best solution to protect them from the elements, but still have easy access.
Here is the final setup for the chlorination system. The storage unit came from Home Depot. It fits 2 chlorine barrels perfectly and was the best solution to protect them from the elements, but still have easy access.