Saturday, May 28, 2011

Electric Approved

The city of Southlake approved the electric work and issued a permit. Now Tri County Electric can come back and install the base meter.

This is the new chlorine pump which will service the system.

Wednesday, May 25, 2011

Final Connections

The new well is now plumbed into the system and new panel up.

Well #1 electric was updated.

Concrete pad, electric, meter, and plumbing added to well #2

Container for chlorine barrels. This will be placed once the concrete pad has dried.

Monday, May 23, 2011

Underground Electric

Under rainy conditions the men were out running the machinery to run the electric underground, put in the grounding stake, etc....

Beginnings of control new control board and well #1 underground electric at SW corner...

Friday, May 20, 2011

Electric & Concrete Work

Today preliminary work began for the well slab.


Installing the base meter and trenching to Tri County's power pole.


Power conduit from well #1 at SE corner of well house.

Thursday, May 19, 2011

Power Pole

Tri County Electric came out this week and installed the new power pole and transformers to meet the requirements of the new well pump.


Thanks to Arthur M. for the pics.

Friday, May 6, 2011

Down Well Pump

The test pump was pulled today...



The new pump....


Tri County will be installing a new pole and meter base next.
Thanks to Arthur M. for contributing pics.

April 2011 Coliform Submission/Report Form

Wednesday, May 4, 2011

Test Pump Running

A portable generator has been brought in to run the test pump. The well is a success at this point.













Tuesday, May 3, 2011

Running the Copper

Today they were running down the water pipe with the electric. They will be working late into the night.