The sight glass for the pressure tank has been updated. The tube was procured online easily, but the original connections for it proved much more difficult. It has now been reworked with fittings easily found at Home Depot. Here is the final setup for the chlorination system. The storage unit came from Home Depot. It fits 2 chlorine barrels perfectly and was the best solution to protect them from the elements, but still have easy access.
The new well is now plumbed into the system and new panel up. Well #1 electric was updated. Concrete pad, electric, meter, and plumbing added to well #2 Container for chlorine barrels. This will be placed once the concrete pad has dried.
Under rainy conditions the men were out running the machinery to run the electric underground, put in the grounding stake, etc.... Beginnings of control new control board and well #1 underground electric at SW corner...
The test pump was pulled today... The new pump.... Tri County will be installing a new pole and meter base next. Thanks to Arthur M. for contributing pics.